I used a circular saw and took a multi-tool where needed then. I was going to level the floor later so I used sealant between the old/new chipboard then at the gaps.
 
  • Like
MVJK
  • Laddar…
Alexander Åkesson Alexander Åkesson said:
I used a circular saw and took a multi-tool where needed afterward. I was going to self-level the floor later, so I used sealant between the old/new chipboard at the gaps.
Do you possibly have pictures from this operation?
 
MVJK MVJK said:
Do you possibly have pictures from this operation?
 
  • Wooden floor construction with exposed beams and integrated plumbing pipes. A coiled electrical wire is visible, and there's construction material nearby.
  • Wooden floor joists under construction with a visible gray plastic pipe and tools lying on the wooden subfloor.
  • A corrugated white tube passing through a wooden board with a measuring tape underneath, indicating depth or clearance in a construction project.
  • Plumbing installation with a gray PVC pipe, wooden framing, and insulation in a room under renovation. Tools and materials are visible around the site.
  • Underfloor heating cables installed on a concrete base, with visible plumbing pipes and wall framing in a bathroom under construction.
  • Plumbing pipes protruding from a primed wall in a construction site, with a concrete floor and a capped drainage pipe visible.
Also screwed new floor joists onto the old ones as you probably see
 
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.