I want to buy stronger reinforcement bars, type 20 mm and up, 30 - 40 is also fine.
We are going to build a pergola out of this.
I have been around and checked, but it seems difficult to find stronger ones at a reasonable price.
What I need are 6 pieces, 3 meters long and, as mentioned, 20 mm or up.
//Mikael
We are going to build a pergola out of this.
I have been around and checked, but it seems difficult to find stronger ones at a reasonable price.
What I need are 6 pieces, 3 meters long and, as mentioned, 20 mm or up.
//Mikael
Member
· Västerbottens län
· 18 057 posts
Do you have any idea what a bar like that weighs, and someone might estimate 10 SEK per kilo.
I just went out and test-lifted a 25 mm steel shaft.
Can’t you imagine a welded steel pipe, if you wash it in tin, it'll be rust-brown by next year. And it weighs a fraction and "is easy to get"
Protte
I just went out and test-lifted a 25 mm steel shaft.
Can’t you imagine a welded steel pipe, if you wash it in tin, it'll be rust-brown by next year. And it weighs a fraction and "is easy to get"
Protte
Member
· Västerbottens län
· 18 057 posts
One can be liable for damages if something like that falls on someone's head.
What you find at the junkyards is often so crooked and bent that it's impossible to straighten it out.
Protte
What you find at the junkyards is often so crooked and bent that it's impossible to straighten it out.
Protte
Member
· Västerbottens län
· 18 057 posts
Completely cleaned steel rusts (unfortunately) all too quickly, and you can speed up the process with some saltwater and sweaty fingerprints. Rust it will, rest assured.
Protte
Protte
I agree, instead buy pipes at a company that sells trade steel. Then bend the reinforcement bars that should be the "roof" and insert the ends of these into the pipes. If you choose the right dimensions, you can probably fit 3 reinforcement bars in each pipe end, which provides a nice opportunity to quickly and easily build a truss.
Member
· Västerbottens län
· 18 057 posts
Then she is the one who gets to help with the lifting too, the only difference is that reinforcement is actually "kamjärn", in the rolling process it gets ridges both lengthwise and crosswise but try to ignore that.
Try to find someone who has neglected the storage of pipes so they have rusted.
Protte
Try to find someone who has neglected the storage of pipes so they have rusted.
Protte
Need reinforcement steel in the dimension of 28-30 mm, have realized it's not the easiest to find.
Only need about 2-3 lengths of 120 cm each. But can of course buy a full length and cut it myself.
I estimate the weight to be 5kg/m, so ~30kg for a full length which is completely manageable... but where can I find it in the Stockholm area?
Only need about 2-3 lengths of 120 cm each. But can of course buy a full length and cut it myself.
I estimate the weight to be 5kg/m, so ~30kg for a full length which is completely manageable... but where can I find it in the Stockholm area?
Click here to reply