Saxpy #1 Member · VALLENTUNA · 984 posts 14 May 2010 at 9:19 PM Saxpy Member VALLENTUNA 984 posts 14 May 2010 at 9:19 PM #1 I poured a new concrete slab on the ground today. How long should I wait before I can apply self-leveling compound on it?
I poured a new concrete slab on the ground today. How long should I wait before I can apply self-leveling compound on it?
L lajsiiwan #2 Member · Skåne · 133 posts 15 May 2010 at 8:15 PM lajsiiwan Member Skåne 133 posts 15 May 2010 at 8:15 PM #2 Ask the supplier or read the instructions on the bag or whatever you used to cast the plate. But after maybe 3-4 days, it's probably risk-free.
Ask the supplier or read the instructions on the bag or whatever you used to cast the plate. But after maybe 3-4 days, it's probably risk-free.