If I am going to make a construction where there should be a beam of 45*45 but as an amateur, I take a 45*70 to be on the safe side.
In the middle of the beam, for some reason, a piece needs to be notched out, in this case, 25mm with a length of let's say 100mm.
On these 100mm, the beam is then 45*45, do I then have the same load-bearing capacity there as I would have had if I put in a 45*45?
/Niclas