Yes, I'm planning to pull the plastic down along the support beams. The attic space should be unheated. The question is whether I should continue with the plastic along the floor of the attic space towards the eaves or if I should stop the vapor barrier at the point where the support beams and the floor joist meet, see attached sketches, where the vapor barrier is drawn as a dashed line...
I don't have any vapor barrier in the exterior wall/roof on the floor below to connect to...