B Bigfoot #1 Member · 1 546 posts 17 Feb 2016 at 7:07 PM Bigfoot Member 1,546 posts 17 Feb 2016 at 7:07 PM #1 I bought a bunch of ceiling moldings from Byggmax. But they have been stored in a cold warehouse for an unknown time, so I thought it might be unwise to cut them immediately. How long should I let them sit inside and adjust before installing them?
I bought a bunch of ceiling moldings from Byggmax. But they have been stored in a cold warehouse for an unknown time, so I thought it might be unwise to cut them immediately. How long should I let them sit inside and adjust before installing them?
Oldboy #2 Member · Skåne · 7 322 posts 24 Feb 2016 at 7:56 PM Oldboy Member Skåne 7,322 posts 24 Feb 2016 at 7:56 PM #2 Well, moldings are quite thin and flimsy, so it should go quickly. A guess is 1-2 weeks. Edit: I'm assuming unpainted moldings.
Well, moldings are quite thin and flimsy, so it should go quickly. A guess is 1-2 weeks. Edit: I'm assuming unpainted moldings.