Hello!
How do you install allmoge ceiling moldings?
Do you install a molding no. 1 (cut straight off on both sides at 90 degrees), then cope one side of the next molding no. 2 on the adjoining wall, and on the same molding no. 2 cut 90 degrees on its other end (and cope molding no. 3 with no. 3 cut 90 degrees on its other end, and so on?) if you know what I mean.
Or in summary: how do you do it?