I have built a bath/kid's pool in the garden consisting of concrete blocks which I then topped with 4cm of concrete to create a slope and a strong edge. The next step is to plaster everything and I'm a bit unsure about how long I need to wait before I can plaster over the concrete without risking shrinkage cracks?
 
At least two days, but preferably a week according to a mason I asked today if anyone else is wondering.
 
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.