Hello
I have cast a concrete slab for a greenhouse, and because of the level difference, I later poured a staircase next to it. Between the slab and the staircase, there are reinforcing bars.
I used rope concrete in between to fill the gap that formed between the pours, but the crack has gotten larger.
What material should be used?