mexitegel #16 Tidsoptimist · Västra Götaland · 21 725 posts 10 Jul 2018 at 5:11 PM mexitegel Tidsoptimist Västra Götaland 21,725 posts 10 Jul 2018 at 5:11 PM #16 Drying times depend on a variety of circumstances, but between 2-5 mm/day is usually a guideline.
AXS #17 Member · Sthlm · 2 910 posts 10 Jul 2018 at 10:57 PM AXS Member Sthlm 2,910 posts 10 Jul 2018 at 10:57 PM #17 N Niklas777 said: What drying times are we talking about before you can skim coat over the drywall? A day has worked for me every time.
N Niklas777 said: What drying times are we talking about before you can skim coat over the drywall? A day has worked for me every time.
N Niklas777 #18 Member · stockholm · 141 posts 10 Jul 2018 at 11:17 PM Niklas777 Member stockholm 141 posts 10 Jul 2018 at 11:17 PM #18 Will it work with gypsum plaster since it needs to be about 2cm thick?
mexitegel #19 Tidsoptimist · Västra Götaland · 21 725 posts 11 Jul 2018 at 12:26 AM mexitegel Tidsoptimist Västra Götaland 21,725 posts 11 Jul 2018 at 12:26 AM #19 Sure, no problem.