I have drawn a beautiful little staircase for a side entrance to the house that I plan to build from pressure-treated wood. How much "waste" should I calculate with when buying lumber? The longest pieces I will use are 1.20 long, and I don't want to splice. I was thinking of accounting for 25% waste, have I allowed enough then?