Hello.
In a few weeks, our plumber will connect GV on our upper floor, and at the same time, we will cast and screed the bathroom. Is there anything we need to consider, what's swirling in my head includes:
- Need for reinforcement?
- Should I cast when GV has been pressure tested with air or when the water is connected, or does it not matter?
- Any specific screed to use when you have waterborne underfloor heating?
The bathroom is just over 5 sqm, and the substrate will be floor chipboard - 12mm embedded coils - waterproofing - tile
Thanks in advance
