I am going to more or less fully renovate my 1960s house, and when it comes to the attic, a lot of things are going to happen up there:

1. Replace the roof (tiles, felt, sheet metal work, and some roof decking, I believe)
2. The electricity will be replaced throughout the house, and some new lamp outlets will be added in the ceilings, so I assume there will be some junction boxes from the attic.
3. Telephone lines need to be rerouted.
4. An FTX system will be installed with a unit and ducts in the attic and supply/exhaust vents in the inner ceilings of the residence.
5. Additional insulation since there is almost no insulation at all in some parts of the attic.

Now the question is - in what order is it best to do this? Is the above the best?

I would like to get a lot done fairly soon, but I would prefer to avoid working on the roof during the winter/rainy season - will I cause problems for myself if I do the other work and tackle the roof last?
 
Last edited: