E engdahl_86 said:
Weird that it wasn't done right from the beginning. The floor below should be the big danger in that case. The house was built in 2007. But the upper floor is being done now.
Went through duct in the middle floor
 
  • Floor with a circular cutout showing a black duct passing through, surrounded by insulation material.