No, this is how it is. A lot of decisions to make, weighing pros and cons.
But I don't think the floor will warp. And it should be possible to work around the gaps in the ceiling panel. Drevremsa or syllunderlägg between the ceiling and the stud, perhaps.
The pre-cut studs that need to be cut again might not be a problem, it could be an advantage. Few houses have exactly the same distance between the floor and ceiling everywhere. You'll probably need to adjust the studs as you install them anyway.