Pay for 4 hours and tell them to leave, bloody jokers, klosettfliege!
 
C Claudia Lendi said:
Thank you for all the answers. Unfortunately, I encountered a real scammer in connection with a roof replacement. The quote only mentioned that the scaffolding is additional. If they didn't fetch the scaffolding from Stockholm but from the neighboring village (in Skåne), the loading wouldn't take many hours either.

Delivery of haki scaffolding: 7,500

Setup of haki scaffolding : 27,000

Scaffolding rental: 9,600

Transport costs: 4,500

In the picture, you can see our dear red cottage. You can't directly see the scaffolding, but I mean it's only on three sides.
Dispute the invoice. From what it looks like in the pictures, a clown built it.
C Claudia Lendi said:
Thank you for all the answers. Unfortunately, I encountered a real scammer in connection with a roof replacement. The quote only mentioned that the scaffolding is additional. If they didn't fetch the scaffolding from Stockholm but from the neighboring village (in Skåne), the loading wouldn't take many hours either.

Delivery of haki scaffolding: 7,500

Setup of haki scaffolding : 27,000

Scaffolding rental: 9,600

Transport costs: 4,500

In the picture, you can see our dear red cottage. You can't directly see the scaffolding, but I mean it's only on three sides.
Dispute the entire invoice. No fall protection, inadequate stairs without a handrail. What clown built this? Stand your ground. They won't get far.
 
  • Like
karlmb
  • Laddar…
P
C Claudia Lendi said:
I have now stopped all work and have canceled the contract. Received an invoice that I intend to partially pay, but he demands 15,700 for the dismantling, see below. Am I interpreting correctly if he means 20 hours at 785.00 hourly wage?

[image]
[image]
I also read your other thread and you've encountered real clowns who should be exposed publicly!
I bought my own Haki when I was renovating my house, and I didn't manage to sell it before I bought my next house where it was used for the roof renovation. Now, the scaffolding has been set up again at the 3rd house, and as the plans look for the future, there will probably be one last house after this, and my scaffolding has cost less than what you've been swindled out of and is enough for at least 2 rounds around your little cottage...
 
  • Like
Claudia Lendi and 1 other
  • Laddar…
C Claudia Lendi said:
I have now stopped all work and have terminated the contract. I received an invoice that I partially intend to pay, but he is demanding 15,700 for the dismantling, see below. Am I interpreting correctly if he means 20 hours at 785.00 hourly wage?

[image]
[image]
Wow! Does he live 6 hours away?
 
  • Like
Anonymiserad 170696
  • Laddar…
S surfarn said:
Hu! Does he live 6 hours away?
No, in the neighboring village. I hoped if you take someone from the area, they wouldn't mess up. I believe his company won't exist for much longer.
 
  • Like
Anonymiserad 170696
  • Laddar…
C
C Claudia Lendi said:
I have now halted all work and voided the contract. I received an invoice which I plan to partially pay, but he is asking for 15,700 for the disassembly, see below. Am I interpreting correctly that he means 20 hours at 785.00 hourly wage?

[image]
[image]
What kind of agreement do you have?
Normally, you either work with a fixed price - action X = Y currency, or a variable price - X hours at Y currency.
Variable pricing applies to actually worked hours.
In any case, the practice is to pay after the work is completed.

Here it feels like you're expected to pay for 20 hours in advance? Regardless of how long the action actually takes?
 
C Claudia Lendi said:
Thank you for all the responses. Unfortunately, I encountered a real swindler in connection with a roof replacement. In the quote, it was only mentioned that the scaffolding would be extra. If they didn't bring the scaffolding from Stockholm but from the neighboring village (in Skåne), the loading shouldn't take too many hours.

Delivery of haki scaffolding: 7 500

Setup of haki scaffolding: 27 2000

Scaffolding rental: 9 600

Transport costs: 4 500

In the picture, you can see our dear red cottage. You can't directly see the scaffolding, but I mean that it stands on only three sides.
That’s a real rip-off... I believe your roofing contractor is getting a 50-70% payback on it, or another larger job they got scaffolding set up for has been billed to you, sadly.
 
  • Angry
karlmb
  • Laddar…
Click here to reply