Due to an old moisture damage, I need to replace the floor marked with a red X. At the same time, I want to take the opportunity to replace the threshold. Now I am wondering how to do this in the best way to achieve a neat transition and still maintain a floating floor. I'm considering letting the floor extend into the area where the threshold is today. Can you place a new threshold directly on top of the floor then, or how would you do it?

Is there a solution to achieve a neat transition to the next floor? Today, there is a metal strip there that I would like to remove if possible.

Attaching images
 
  • Wooden floor with a red "X" mark indicating a section to replace due to water damage; visible metal threshold between two floor sections.
  • Damaged wooden floor marked with a red X near a threshold, showing exposed screws and a removed metal strip, part of a renovation project.
Is it possible to place a threshold plate on top of the floor without drilling/gluing it? How do you make it sit properly then?
 
R
Nah, just ignore the threshold completely, let the new floor go all the way in to meet the other floor, then you put a thin metal/wood strip over the seam.
 
Thanks for the tip! How do I attach the strip over the joint, considering that the floor is floating?
 
R
hmm they should work with the screw that is included.
 
Do you mean I screw it into the space between the two floors?
 
kia2 said:
Do you mean I screw it in the space between the two floors?
Cut the frame just above the new floor height and let the floor go under the frame. Then screw a molding with a suitable screw. Depending on the surface under the floors, either in between or into one of the floors.
 
R
If you don't want to lock it to either side, you can do that,
 