No KA was needed so I don't have one, but maybe I need to get one anyway to figure this out. This is what the approved construction drawing looks like and according to the architectural firm that designed it and their fire expert, the gate and door need to be EI30 rated. The door is not a problem.

Blueprint of a garage/storage extension, showing dimensions, fire rating EI30 for doors, and construction details. Plan and section views included.
 
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.