Hi, I need some advice. As the picture shows, I'm considering filling a section with blasted rock and then laying 0-32, and the final layer 0-4, is that a bad idea? Because I have a lot of blasted rock, and it's for those L-supports that will be placed there as a corner and backfilled with morän.