When I did the bathroom, I didn't dare to level the floor myself, so I let the flooring installer do it. But after the casting and it was set, I primed the entire floor. It took 4 weeks before the leveling compound was applied.
I think the risk is that it dries too quickly otherwise and cracks or lifts??