We tiled the kitchen wall and laid tiles on the hall floor last weekend. Now we want to grout. And then I read in the documentation for the tile grout that you should grout no later than 3 days after placing the tile (see image from the document).
Does anyone understand this - what is the problem if you do it a little longer after these 3 days? What are the consequences/risks of grouting later than the recommended 3 days, as we will be doing?
Well, I have similar occupational injuries, so one must assume that the person who wrote the instructions didn't think in the same way. Possibly it's a translation error.