The problem is probably finding two good stones and a nice piece of wood to build with..
Otherwise, it's doable with simple tools...
Otherwise, it's doable with simple tools...
Feels like a day's work in hours. The difficult part will, of course, be achieving a satisfying aesthetic. It's a bit different fastening a two by four to 2 lecablock compared to what he did in the film. But philosophically equivalent.
So probably 8 hours of work, 32 hours of bouncing back and forth with different design/material proposals.
650 SEK/h + material + shipping = Budget price 6500 - 26000 SEK + 800 SEK + shipping = Between 10300 - 29800 SEK
Based on the materials I have available.
So probably 8 hours of work, 32 hours of bouncing back and forth with different design/material proposals.
650 SEK/h + material + shipping = Budget price 6500 - 26000 SEK + 800 SEK + shipping = Between 10300 - 29800 SEK
Based on the materials I have available.
Can previous work be seen?Grylf said:
Feels like a day’s work in working hours. The difficult part will of course be achieving a satisfactory aesthetic. It's a bit different to bolt a two-by-four to 2 concrete blocks compared to what he did in the movie. But philosophically equivalent.
So probably 8 hours of work, 32 hours of bouncing back and forth with various design/material proposals.
650 SEK/h + material + shipping = Budget price 6500 - 26000 SEK + 800 SEK + shipping = Between 10300 - 29800 SEK
Based on the materials I have available.