Can I have an overhang on the beam compared to the post shoe it's resting on with 300 mm?
Can one or more plinths on the transverse floor beam marked in red compensate?
I will have more plinths under the beam than drawn.
The beam is a glulam 66x315, and the outer floor beam is a glulam 45x225.
It is a sauna/relaxation room at 4900x3400 with a light roof zone 2.