I plan to install a pull-up bar and a punching bag. The wall is made of lightweight concrete. The bag weighs about 60kg. I weigh about 90. The pull-up bar extends about 60cm with at least 4 mounting points. The question is, what is the best method to get it to hold? Do you have any tried and tested tips? I'd prefer to avoid a plate on the wall for aesthetic reasons.