I need to hear from you "experienced" folks regarding the time required for some work tasks:
About 24 linear meters of studs installed in a rectangular ceiling - no leveling or similar, just 5 studs along the ceiling and one along the short side.
About 20 linear meters of studs installed in an adjacent rectangular ceiling, 7 studs along the ceiling and one along the short side.
Drywall and spackle two walls, both 250 cm in height, one wall 280 cm wide, the other 230 cm, each having a window of 140 * 100 cm breaking the wall.
10 vertical studs about 60 cm each, installed between two horizontal studs as extra support for upcoming OSB and drywall.
Grateful for feedback!!
About 24 linear meters of studs installed in a rectangular ceiling - no leveling or similar, just 5 studs along the ceiling and one along the short side.
About 20 linear meters of studs installed in an adjacent rectangular ceiling, 7 studs along the ceiling and one along the short side.
Drywall and spackle two walls, both 250 cm in height, one wall 280 cm wide, the other 230 cm, each having a window of 140 * 100 cm breaking the wall.
10 vertical studs about 60 cm each, installed between two horizontal studs as extra support for upcoming OSB and drywall.
Grateful for feedback!!
Quite a long time - 20 hours. The thing was that I didn't want to state the time it took, but rather let someone with experience in such jobs give their view on what it should take without a preconceived notion.