Hello, those of you who erect house frames. How much time and how many people (experienced professionals) would you say it takes to erect a stud wall (exterior wall and not assembly) of 11.5m, plumb, brace, and fasten to the concrete slab?

Just one side, that is.

Thanks in advance
 
A complete wall (wind and vapor barrier sheathing, panels/what kind? plywood/OSB/gypsum? insulation?) or just the structure. And building a freestanding wall, or replacing an existing one or filling in a structure? c-c and stud dimensions? height? windows/doors? and more...
 
A bit late in response but.

Currently building an upper floor on the house. Wall blocks were built on the ground and on the assembly day, the walls were lifted with a crane truck and mounted on the new intermediate floor.

Two carpenters and a crane operator. The first wall was lifted around 8 AM and all walls plus roof trusses were mounted by 3 PM.
 
H HasselmarkenHampus said:
A bit of a late reply, but.

Currently building an upper floor on the house. Built wall sections on the ground and on the assembly day, the walls were lifted with a crane truck and assembled on the new intermediate joists.

Two carpenters and a crane operator. The first wall was lifted around 8 AM and all the walls plus roof trusses were assembled by 3 PM.
Crane truck sounded like a cop-out 🫣😀 Thanks, but the framework is up.
 