Do I get sufficient load-bearing capacity to tile a 2.40 m high wall framed c/c 45 with 45 steel studs, type Lindab's RE 45 (http://www.lindab.com/se/pro/products/Pages/RE.aspx) and then double layers of wet room gypsum on top of this?
Does anyone have tips or experience using steel studs to frame a wall consisting of a 1.5 m vertical part (tile as surface layer) + just over 1.2 m sloped ceiling (painted surface)? Is there a smart way to solve this? I want to use steel studs since it is an exterior wall in a wet room.
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.