M
Hey!

I have a carpentry firm that is handling various tasks in our newly purchased house. They have installed furring strips and plastered the ceiling. The quote states that the customer paints themselves. I was expecting a simple spackling job, but it seems like it needs more than usual? This is how it looks where all the plasterboards meet.

We're not very knowledgeable, so maybe I'm mistaken. Could you please share your expertise with us 🙂
 
  • Close-up of drywall ceiling with visible seams and screws, showing joint compound and tape at junctions, indicating unfinished work.
  • Close-up of a ceiling showing joints where drywall panels meet, with visible screws and rough plastering.
Frerider
Yes, the joint edges should be sanded about 45 degrees so that filler adheres, sand the edge a bit more in some places and then filler and paper tape..
However, it looks a bit sparse between the screws.
 
  • Like
mrbackstrom and 4 others
  • Laddar…
M
Thanks for the quick reply, then I won’t scold the builders for a bad job 😂 I also appreciate the tips on how we should proceed 👍
 
A
Frerider Frerider said:
Yes, the joint edges should be scraped at about 45 degrees so that the filler sticks, scrape the edge a bit more in some places and then apply filler and paper tape...
Looks a bit sparse between the screws though.
Well. You only need to cut down the paper edge as it usually sits poorly at the ends (it rises under the filler and tape if it's loose)
That is way too much cut off. But it works for DIYers…
 
  • Like
mg92
  • Laddar…
Doesn't really look like professional work with both a cracked board and screws spaced far apart. I'd say they decided to outsource the easy job but took on the difficult one themselves. Plastering a ceiling isn't easy if you want a good result.

There are boards for ceilings available to buy that have recessed edges even on the short end.
 
  • Like
mrbackstrom and 1 other
  • Laddar…
Frerider
A Axeler said:
Well. You just need to trim the paper edge since it usually sits poorly at the ends (it rises under the putty and tape if it is loose). That is way too much trimmed. But works for do-it-yourselfers...
All the pros cut more than that😉
 
  • Like
Uttese and 2 others
  • Laddar…
D
The screw spacing looks normal. 20cm on the edge, 30cm inside the board. Ts should double-check.
Stop scaring him.
 
  • Like
FraCap888 and 3 others
  • Laddar…
D Drburr said:
The screw spacing looks normal. 20cm on the outer edge, 30cm inside the board. Ts should double-check the measurements.
Stop scaring him.
If you discount the screw that went through the paper, there won't be any 20cm ;)
 
  • Like
janusz_w and 1 other
  • Laddar…
Frerider
L Liljeros said:
If you exclude the screw that has gone through the cardboard, it won't be 20cm ;)
Doesn't look like 20-30 c/c. Or is the picture deceiving?
 
  • Ceiling drywall with visible seams and screws, questioning spacing.
  • Like
mg92
  • Laddar…
D
Frerider Frerider said:
Doesn't look like 20-30 c/c. Or is the picture lying?
I don't attempt to estimate centimeters from a picture, but I rarely get sent nudes, so I haven't practiced that either. Ts will have to bring out the measuring stick and measure as mentioned. The one that says Hultafors on it, then.
 
  • Like
  • Haha
sk0nk and 7 others
  • Laddar…
M
No, you are right, they've missed some screws here and there, and the distance in some cases exceeds the limits of 20 cm along seams and 30 cm inside along the plasterboards. Thank you for bringing this to my attention. I will point out that they need to screw in more screws to secure the ceiling. Fortunately, this is not a pattern seen across the entire ceiling, and sometimes it only deviates by a few centimeters from the limit.

As a complete novice at renovating where we subcontract 80% of all the work, painting the ceiling on the quote seemed like a trivial matter. I later read that plastering is part of the ceiling painting work, which didn't particularly scare me. It wasn't until I saw the result, as you can see in the pictures, that I realized plastering is a big job. I had imagined some screw holes and minor seams. They have really done a poor job of communicating this to me as a customer, especially when I emphasized that we are beginners and care about a nice result.

So, I'm starting to wonder if we have the right on our side? But maybe it falls within the scope of professionally executed work, with the exception of some damage here and there and the premise that they screw in a little more to meet the cc distances.
 
  • Like
Frerider
  • Laddar…
The roof won't fall down just because the screw is a few cm too far apart or because there's a missing screw here and there.
 
  • Like
Golvläggare and 13 others
  • Laddar…
It might be worth hiring a painter to handle this quickly.

I've done some spackling and painting on a hobby level with good results, but I don't think I'll ever smooth spackle a ceiling again.
 
  • Like
Golvläggare and 2 others
  • Laddar…
Frerider
Persson88 Persson88 said:
the ceiling won't come down just because the screw is a few cm too far apart or because there's a screw missing here and there.
You are absolutely right if all the screws were properly in place, however, you can see in TS's pictures that the screw is going through the felt, meaning the load capacity is gone in that screw and a new one should be screwed in next to it😉
 
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.