It is generally estimated that it dries 1 mm per day, but that is the formula for laying a covering over it, i.e., a tight mat on top.
If you are just using the self-leveling compound as the surface, it should be hard enough in 6-8 hours.
You could lay tiles over early, as it still dries through its joints.