In the midst of plastering inside. My question is whether you can partially plaster a wall and continue the next day?
The reason is that I have a wall that is 30m2 and I won't be able to finish it in one day.... I'm plastering with C-bruk on leca and at most I've managed to get up 16m2 in one day including board curing. If you're going to pause the plastering, what should you keep in mind?
 
Long wall! Do you have any door or window you can break through?
 
leby leby said:
Long wall! Do you have any door or window you can break at?
Yes, a window and 2 doors. The section is 10.7 meters long and 3.2 meters high, so it needs to be planned properly before I start mixing mortar.. :). I have some other walls to do before tackling this one, but it's getting closer...
 
Now I'm no expert but I would choose to break at the door(s) in that case. You had a very high ceiling, are the doors tall? If not, I've been taught to use fiber-reinforced plaster just above doors in basements to reduce the risk of cracks (in the extended seam if you know what I mean). In those cases, it fits well to break there.
 
I have also wondered if it is best to break at doors and windows. The doors are 2.1 and the window aligns at this height. so there is 1.1 meters above these.
 
Borrowing a bit. I started plastering my lecablocks for the greenhouse yesterday, at first just with Murningsbruk A (Finja). Can you go back and add a little more in places if you skimped somewhere?
 