Hello!
I am planning to lay 30x60 tiles outdoors with Killto Floorfix DF and a hummer notched trowel and also plan to back-butter the tiles.
I'm wondering if it's feasible to use a leveling system outdoors as well since 100% coverage is required, or if it's not suitable?
/Andreas