P pjop #1 Member · STHLM · 340 posts 21 Jul 2009 at 7:54 AM pjop Member STHLM 340 posts 21 Jul 2009 at 7:54 AM #1 Hello, we are in the process of replacing pipes in the cellar floor and will soon have the channels filled with concrete. - How long do we have to wait before we can lay tiles on the floors? - The slab is uninsulated Thank you P
Hello, we are in the process of replacing pipes in the cellar floor and will soon have the channels filled with concrete. - How long do we have to wait before we can lay tiles on the floors? - The slab is uninsulated Thank you P
P Plupp 23608 #2 Anonymous 21 Jul 2009 at 10:58 AM Plupp 23608 Anonymous 21 Jul 2009 at 10:58 AM #2 It depends on which bruk you use for the casting. Use a ROT-bruk so you won't have to wait several months for the concrete to finish shrinking.
It depends on which bruk you use for the casting. Use a ROT-bruk so you won't have to wait several months for the concrete to finish shrinking.