Hello,

we are in the process of replacing pipes in the cellar floor and will soon have the channels filled with concrete.

- How long do we have to wait before we can lay tiles on the floors?
- The slab is uninsulated

Thank you

P
 
P
It depends on which bruk you use for the casting. Use a ROT-bruk so you won't have to wait several months for the concrete to finish shrinking.
 