R r91 #1 Member · 108 posts 25 Aug 2024 at 3:00 PM r91 Member 108 posts 25 Aug 2024 at 3:00 PM #1 Got demolition permission for our patio. Now all that's left is to tear it down. However, a drainage company has already been here and dug away along the wall. So can't set up anything there. The height is probably closer to 3 meters. #balcony #demolish
Got demolition permission for our patio. Now all that's left is to tear it down. However, a drainage company has already been here and dug away along the wall. So can't set up anything there. The height is probably closer to 3 meters.
R Rickard.lj #2 Renovator · Värmland · 1 178 posts 25 Aug 2024 at 3:39 PM Rickard.lj Renovator Värmland 1,178 posts 25 Aug 2024 at 3:39 PM #2 Start picking the roof and roof leaks, then start with the roof rafters, as if you were rebuilding, one at a time.
Start picking the roof and roof leaks, then start with the roof rafters, as if you were rebuilding, one at a time.
R r91 #3 Member · 108 posts 26 Aug 2024 at 8:19 PM r91 Member 108 posts 26 Aug 2024 at 8:19 PM #3 Had to be an improvised stand