I will recast the floor after replacing the sewer pipes in the basement.
Is there any concrete that "cures quickly" so you don't have to wait 2-3 months before laying tiles?
The floor will also be leveled before laying tiles, do you have to wait 2-3 months before you can level and lay tiles after casting with concrete, or does the 2-3 months not apply if it is leveled?