Hello,

I need to put up a new wall in the upcoming bathroom. The challenge is that the sewer stack makes it difficult with the base plate.

I want the finished wall to come as close to the stack as possible, how would you do it? On the studs, there will then be 15mm plywood, plasterboard, and vinyl flooring.

The sewer stack protrudes 240mm from the back wall.
Concrete floor with a grey sewage pipe protruding at an angle, surrounded by wood wall. Pipe secured with metal strap, some wood debris present. Drain pipe extends 240mm from wall with tape measure; construction debris visible.

Best regards, Andreas
 