Hello!
I've started to set up a bit provisionally for the spring deck construction with some sections of the final bits of pressure-treated wood.
It's 45x195 for both the floor joist and the support beam, and it's 2.2 meters between the posts.
It should be possible to skip one in the middle considering the wood.
What do you think? And how would you do it?
Thanks in Advance!