Grannens Häck
How long does it take for 40kg of concrete to cure enough to bear a load? It is a foundation cast directly in the ground and will take loads in multiple directions.
 
Full strength after 28 days at +20. In your case, it depends on the temperature in the ground and how much you plan to load it.
 
But it is extremely rare that 100% strength is required. 80% is more than enough and then you also have tensile load. I would feel confident after 7 days.
 
  • Like
Grannens Häck
  • Laddar…
Grannens Häck
Interesting, I'll have to consider if I can wait 7 days or if I'll become too impatient.
 
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.