I'm not really a "pro" at this, (even though I've done the same thing)
The big problem is that it takes longer for the mortar to cure. If you're quick at laying bricks, it can be a problem (the cement doesn't have time to cure and the pressure on the bottom stone becomes too high). First row - no problem - second row - no problem, but by the third row, the bottom row must have started to cure.