Hi,
I went to the building supply store this morning and bought pre-painted rough-panel that I plan to install indoors this weekend. The package says the panel should be indoors for at least a week before installation.
Is that really necessary? The outdoor humidity is currently about 60% and indoors about 53% (it's quite wet and rainy outside today), at the building supply store, the packages were in a metal hall.
Is it safe to install the panel tomorrow when it's only been inside for about 24 hours? I feel like the indoor and outdoor climate difference isn't that big right now, but it would be unfortunate if the end result turns out poorly.
/Tobias