The question may not be as tricky as it sounds, but still!
Let's say you should have 2.4m to the ceiling like a regular house.
Where do you measure from?
example - from the concrete slab to the plaster,
or from finished floor to the joists
or from the concrete slab to the joists
or from finished floor to etc. etc......
sending a section of k-section drawing!