I have a garage construction with a low-sloped roof extended from an existing building where I have installed roof beams and wall frame.
The next step is roof decking and roofing felt.
Is it best to nail on battens and windproof fabric now from a storm protection standpoint, or is it better to wait and leave the frame open while installing the roof decking and felt?