Hello

I'm sitting here pondering my spring deck project and have hit a snag. The deck is going to be 5.5 meters wide and 2.4 meters deep, and I planned to place the support beam on 3 posts. Now it turns out that right where I intended to put the middle post, the sewer line comes out, which means it might be a bad idea to dig there.

Is it even worth trying to size the support beam for a span of 5.5 meters, or do I need to think of another way to solve it?
 
Glued laminated timber should handle 5.5 meters without major problems, but it will be a higher beam, and depending on how it looks, it might get cramped.
The alternative is four posts so that you get better points for the foundations.
 
Mikael_L
Shouldn't it be possible to place the plinths 1 meter in, so there's an overhang on the support beams.
So, 3.5 meters between the plinths and then the support beams extend 1 meter on each side = 5.5 meters.

Then 45x220 should be sufficient, right...?
 
I might add that I am going to extend an existing balcony into a patio. It is 6.60 m wide and rests on 3 pillars. I plan to extend it with a 1.1 m wide staircase and a 5.5 meter wide patio. I want to align the new pillars with the existing ones as much as possible, but I might have to let that go and add an extra pillar.
 