Hi,
The wooden beams have been removed, and now a slab is being installed.
60-65cm from the bottom to the intended floor level.
The initial thought was to use crushed stone and then foam insulation according to all the rules.
Now, a proposal has been submitted to use insulation all the way and then a slab on top instead.
The reason is that it's quite a bit of work to get the crushed stone in.
Will we encounter problems with capillary breakage, or will 50cm of insulation solve this?