Hello, I am about to build a base for a greenhouse but I'm facing a small dilemma. One of the long sides will end up underground about 50-60 cm where I've excavated. The problem is that there will be just under 10 cm between the "earth wall" and the wall I'm building, so I thought that maybe I could coat/render the blocks before building with the same mortar I'm using? Is this doable or a bad idea? :thinking: I then plan to lay down a type of dimpled membrane before backfilling.
 
Plaster with cement mortar on top of red primer when the wall is below ground level.
 
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.