We are going to build a two-story aerated concrete house where the span will be a maximum of 6 meters for the intermediate floor.
Which intermediate floor is best considering impact sound, installation of electricity, water, and underfloor heating, and not to forget the total price of materials + labor?
Thanks in advance/AoA