Hello!

In a week, it's finally time for the house to arrive and the wall panels to be erected, something we've been eagerly waiting for.
Since this is probably my biggest project and I have time off from work that week, I've planned to be present during the entire assembly. Partly out of curiosity and partly to have some control over what's happening.
The house to be erected is an A-house in Umeå, which I've designed together with my partner, and the construction is being managed through shared contracting where the assembly is performed by a different company than A-hus.
My mind is swirling with thoughts constantly, so I'm more dizzy than usual, but I guess that's just part of building a house :)
What I'm wondering now is if anyone has tips and information on this excellent forum about what to keep an eye on and maybe inspect a bit extra during the assembly.
How should wall panels on trucks and already erected wall panels be protected if there's precipitation?
Yes, anything you can write down is of great importance.

Thanks in advance!
 
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.