Insulate with 70mm in the wall
Double boards on both sides of the wall
Seal the gaps with joint compound (flanking transmission) along the boards before nailing the trim
...and make sure that the ceiling and the floor are not connected between the rooms. If they are, it is advisable to cut a gap before building the wall.
Click here to reply
Vi vill skicka notiser för ämnen du bevakar och händelser som berör dig.