I've encountered trouble, I'm supposed to cast down a pipe, which is for the engine heater, but when we pulled the hose, we hadn't measured properly, so the hose is not long enough. I would prefer it to come into the new pipe, but I'm not sure how to achieve this.

I should also mention that there will be electrical cables later in the same green hose, but will need to make a branch a bit earlier.

How would you have done it?

Green hose and cylindrical pipe positioned in a construction site, with concrete blocks and soil visible, related to motor heater installation issue.
 
Last edited:
Splice the pipe and a new piece of pipe to the required length?
 
Edit:
The hose, not the pipe.
 
Ws1 said:
Edit:
The hose, not the pipe.
The roof has hit me, the problem is that I haven't found anyone around here who sells by the meter, only entire rolls:(
 
Have you kindly asked your electrician/building supply store if they have any scrap pieces?
Rarely impossible :)
 
Diagram showing connection plans with lamps marked in yellow, black lines as walls, and gray line for electric cable routing from the engine heater.

This is how it looks at home now, but I plan to stick the hose up in the Stolepn for the engine heater.

But how do I get electricity to the lamps?

As I see it, there are at least 2 options

1. Run a new hose between each lamp. Then the power will go to the lamps, starting with lamp 1 (the one on the right).
2. Make a branch on the current hose, run the hose between the lamps, it will be a cable without a hose then. bit certain

HELP I'm going crazy with this stuff.
 
If you are going to make one or more branches, you need to have a connection point there. How else will you get the cable to go the right way when you pull it after backfilling?

I would have chosen to feed the lights with a new conduit from the pole, perhaps with a smaller dimension.
 