FIXED STRUCTURE AND HEAVY LOADS MOUNTED ON THE FLOOR:
When installing a fixed structure (kitchen cabinets, islands, bookshelves, etc. on a floating COREtec®
floor, ensure that:
1. It only concerns a single installation point.
• If there are multiple fixed structures or heavy loads in the same area, you need to install transition gaps in front of them.
• If multiple fixed structures or heavy loads need to be installed in interconnected areas, you must install transition gaps between the different areas.
2. If there is a single heavy load, the opposing expansion space must be increased to 12 mm.