Våt byggvaruhus sells 6m culverts, can you buy them by the meter as well? Like 6+6+1 meter? The disadvantage is that you need another double coupling...
12 (6+6) meters of culvert is barely enough, we then only get a 35 cm overhang on each side of the road/parking lot, can that really work?
12 (6+6) meters of culvert is barely enough, we then only get a 35 cm overhang on each side of the road/parking lot, can that really work?
I haven't tested it, but you could put a muff on the end that doesn't have a factory-installed muff.
With a 400 drum plus a bit of road embankment on top, you get approximately a 45-degree slope on the edges, and it works if you pack the maaterial. Then maybe you could place some stones or similar at the bottom and gain a little height that way.
With a 400 drum plus a bit of road embankment on top, you get approximately a 45-degree slope on the edges, and it works if you pack the maaterial. Then maybe you could place some stones or similar at the bottom and gain a little height that way.